ONGOING PROJECTS

BUILDING COMPETITIVE    ADVANTAGE

ROADS

Lane Kilometers in progress 2212 Km.
    BOT 1. Six laning of Indore - Dewas section of NH-3 from Km.577.550 to Km.610.000 and Km.0.000 to Km.12.600 (Approx Length 45.05 Kms.) in the State of Madhya Pradesh under NHDP Phase - V to be executed as BOT (Toll) project on DBFOT Pattern Project.

2. Four-laning of Panikoili – Rimuli Section of NH – 215 from Km. 0.000 to Km. 163.000 in the State of Orissa to be executed as BOT (Toll) project on DBFO Pattern under NHDP Phase III

    Item 1. Widening and Strengthening of existing National Highway from Two lane to 4 lane from Km.93.00 to Km.60.00 of Brijni to Assam / West Bengal Section NH-31 C on East West Corridor under Phase - II Programme of NHDP { Contract Package - EW - II (AS - 10) }
2. Widening and Strengthening of existing National Highway from Two lane to 4 lane from Km.60.00 to Km.30.00 of Brijni to Assam / West Bengal Section NH-31 C on East West Corridor under Phase - II Programme of NHDP { Contract Package - EW - II (AS - 11) }
3. Four laning of National Highway from Km.40.00 to Km.60.50 fo Maibong - Munding Section of NH-54 in Assam { Contract Package - EW - II (AS - 27) }
4. Improvement of Naranpur – Pandapada – Harichandanpur – Brahmanipal - Duburi Road in the districts of Keonjhar and Jajpur.
5. Widening to 2-laning of Longleng - Changtongya road, Mon - Tamlu - Merangkong road, Phek - Pfutsero road and Zunheboto - Chakhabama road in the State of Nagaland.
6. 2 laning/ realignment from Km 11.500 to 130 of NH-44A in the State of Mizoram MORTH
7. Widening and Strengthening of Mydukuru - Jammalamadugu road from Km.177.400 to 194.670 in Kadapa District, Adnhra Pradesh

IRRIGATION

1. Chintalapudi Lift Irrigation Scheme-Detailed Investigation, designs and construction of Lift Irrigation Scheme for drawal and lifting of water from river Godavari near Pattiseema(V), Polavaram (M) in West Godavari District to proposed reservoir across Jalleru near Routugudem(V), West Godavari with all necessary branch canals, distributaries and Field channels including CM & CD Works to cater the irrigation needs in this reach of main canal (for 0.45 Lakh acres approximately) including operation and maintenance of the entire system complete(Package No.1 of Ch.L.I.S)
2. Chintalapudi Lift Irrigation Scheme – Detailed Investigation, designs and execution of Main Canal the end point of the package-1 in the village limits of Gangannagudem (V) upto Tail end together with all necessary Branch Canals, Distributaries and field channels including CM & CD works including tunnel for a length of about 2.00 Km complete to cater Irrigation needs in this reach of main canal (for not less than 1.55 lakh acres). including operation and maintenance of the entire system complete (Package No.2 of Chintalapudi Lift Irrigation Scheme)
3. Package No.8: Dummugudem Nagarjuna Sagar Project Tail Pond Link Canal from Km.182 to Km.206, i.e., from near Tirumalagiri (v) on NH-9 upto the road connecting Malkapatnam (v) and Salakanoor (v) to carry 19000 cusecs E.W.E and F.E. of gravity canal including C.C. lining and C.M. & C.D. works, Aqueduct and viaducts across Musi River
4. Package No. 9 : Dummugudem Nagarjuna Sagar Project Tail Pond Link Canal from Km.206 to Km.244 (upto tail end) to carry 19000 cusecs, i.e., from the road connecting Malkapatnam (v) and Salakanoor (v) upto Halia River near Ibrahimpet (v) E.W.E and F.E. of gravity canal including C.C. lining, C.M. & C.D. works, structure to cross Nagarjunasagar Canal and regulated out fall structure at Halia River
5. Package No. 33/2006 : Rajiv Sagar Lift Irrigation Project (Dummagudem) Laying of Pressure mains including surge protection against transient for pressure mains from pump house 3 to Bethampudi reservoir and from pump house 4 to cistern @ KM.6.20 and from pump house 6 to Sudimalla Pedda Cheruvu including CM & CD works
6. P.P.R.M.C – Work for conducting detailed investigation, including sub-soil exploration, preparation of H.P’s Designs, L.P.Schedules, Drawings fixing B.M.Stones, Excavation of Canal from Km.71.500 to Km.105.10 (Package – 4) including lining entire canal
7. Velugonda Project - Closing of Sunkesula Gap Excavation of Feeder Canal and Teegaleru Canal including Construction of CM & CD works Distributory System for 62,000 Acres (Package - 2) on EPC Turn Key System.
8. Execution of canal system of Indira Sagar Project, main canal from R.D. 130.935 Km. to 155.00 Km. including distribution network upto 40 ha chak for Irrigation culturable command area of about 6103 ha. On turn key basis comprising the work of survey, planning, design, estimation, preparation of land acquisition cases, forest cases and its clearance, Shifting of H.T. & L.T. electric lines, construction of canal by excavation / earth work, cement concrete lining with paver machine, all inline concrete structures like V.R.B./D.R.B. / N.H.B. / S.H.B. / C.D. Works, Aqueducts, Super Passages, Falls Head Cross Regulators, Escapes, Out lets etc where ever required and commissioning of canal system.
9. Package No.04/06 ‐ Investigation, Design and earth work excavation GNSS main canal from Km. 119.000 Km. 141.350 including construction of CM & CD Works and formation of Uddimadugu Reservoir on EPC Turn Key System.
10. M & MI – Modernisation of Yeleru Irrigation Drainage System work of completing Yeleru Irrigation system and part of the drainage system covering namely Yerra Calva, Gorrikhandi Veeravaram Calva and Dabba Calva
11. Construction of Earthen Dam of Hiranyakeshi (Sarafnalla) Medium Project, Tal. Ajra, Dist - Kolhapur.
12. Package-II of Nagavali - Formation of flood bank on Nagavali river from Right-Margin Sunki (V) of Vangara Mandal to Hythnagaram of Srikakulam Mandal and left Margin from Naguru (V) of Veeraghatam Mandal to Kallepalli (V) of Srikakulam Mandal including Srikakulam Town limits of Srikakulam District.
13. Construction of Kudri Barrage Project including vertical lift gates stop log gates gantry crene remote control operation and other appurtenat works.
14. Water Reservoir at Plant Site, Kalinganagar

DREDGING PROJECTS

1. Modernization of Coringa River by Dredging from Teki Drain infalling to Sea Mouth in CIP Basin at Godavari Eastern Delta, Drainage System. (Package No.15/GDS/EG/2009-10)
2. Modernization of Kunavaram and Vasalatippa Major Drains by dredging infalling to sea in Sea Mouth Basin of Godavari Central Delta Drainage System. (Package No.16/GDS/EG/2009-10)
3. Modernization – Godavari Delta Drainge System – West Godavari District – Drainage - “Gontheru Sub Basin from Km. 38.60 to Km. 50.680 (By Dreding) in Upputeru Basin in West Godavari District” Package No.27/8/GDS/WG/2009-10
4. Modernization - Krishna Delta System – Guntur District – Drainage - “ Modernization of “Dredging of East Thungabadra Drain from Km 0.000 to Km 5.750 in Guntur District” on E.P.C. Turn Key System

INDUSTRIAL PROJECTS

1. Site Grading, Service & Peripheral Road, Drains and Laterite Brick Boundary Wall and Sansoil Boudary Wall for Kalinganagar Project
2. Balance Civil Works in BOF, GCP & CCP Area for Phase - II Project of Integrated Iron & Steel Plant being set up at Kalinganagar Industrial Complex, Duburi, Orissa
3. Construction of Plant Drainage System
4. Civil Work for 3 Nos. of IM section Shed
5. Civil Works for RMHS for Tata Steel, Kalinganagar
6. Erection, Alignment, Painting Work for RMHS for Kalinganagar
7. Fabricated Structural work for RMHS for Tata Steel, Kalinganagar

RAILWAY PROJECTS

1. Construction of Railway Formation in fitting / cutting, minor bridges, major bridges retaining wall, drain works, track linking incluidng supply of ballast etc.

POWER PROJECTS

    Thermal 1. Gayatri Developing 1320 MW ( 2 x 660 MW ) Coal fired Super Critical Thermal Power Plant. Painampuram village, Muthukur Mandal, SPSR Nellore district, Andhra Pradesh Joint Venture with Semcorp, Singapore in the name of Thermal Powertech Corporation India Limited. - Gayatri Executing all types of Civl works inthis plant
2. Gayatri Involved in NCC Power project Development of 1320 MW Coal based Power Project Muthukur Mandal, SPSR Nellore district, Andhra Pradesh Joint Venture with Semcorb
    Hydro 1. Gayatri Developing Lower Yamne Hydro Electric Project Stage 1 - 50 MW (2 x 25 MW) Lower Yamne Hydro Electric Project Stage 2 - 40 MW (2 x 20 MW) on Yamne River, Siang District, Arunachal Pradesh the project known as Yamne Power Private Limited and Gayatri executing all types of civil works in this project
Wind Power 1. Gayatri installed 5 Wind Mills each 1.5 MW at Theni, Tamil Nadu.

TRANSMISSION AND DISTRIBUTION

1. Design, Manufacture, Pre-disptach Inspection, Testing and Supply of Materials for "Construction of New 11 KV Line, LT Line on AB cable, 25 KVA 11/0.4KV Distributin X/mer Sub-Station, Four Pole Structure, Additional 11 KV Bay with VCB, Replacement of Bare LT line with AB Cable etc., (Lot No.X), Ratlam District
2. Design, Manufacture, Pre-disptach Inspection, Testing and Supply of Materials for "Construction of New 11 KV Line, LT Line on AB cable, 25 KVA 11/0.4KV Distributin X/mer Sub-Station, Four Pole Structure, Additional 11 KV Bay with VCB, Replacement of Bare LT line with AB Cable etc., (Lot No.V), Barwani District
3. Supply & Erection work of 400KV D/C Amareli - Kasor (Part:2) - 82.170 KM (AP 28 to AP44) on turnkey basis
4. Suypply & Erection work of 400KV D/C Amreli - Kasor line (Part:1)-80.475 KM (Amreli Gantry to AP28) on turnkey basis
5. Supply & Erection of 400kV D/C Mundra-Zerda line no.1 on turnkey basis Package - III - 156.103 km (AP 46 to Zerda)